| |
|
HOTELS
& RESORTS
PAN PACIFIC SINGAPORE NEWLY-RENOVATED
Singapore, 16 January 2008¨C
Pan Pacific Singapore has unveiled newly-renovated rooms and
suites at the conclusion of the exercise in January 2008.
With a multi-million dollar investment, the new rooms and
suites boast a contemporary look and feel while maintaining
the signature warmth of the brand¡¯s accommodation design aesthetic.
The overall changes included soft furnishing, furniture, bathroom
fixtures. Technological updates encompass the air-conditioning,
lighting and audio-visual capabilities with the introduction
of sleek flatscreen Hitachi LCD televisions, Bose Home Entertainment
systems (suites only) and a custom-designed audio-visual portal
(Please refer to the Custom-tailored Traveller Technology
section). Key features such as the ample work desk, designer
Artemide Tolomeo lamps and ergonomic Herman Miller chairs
have been maintained.
Pan Pacific Singapore continues a refurbishment-driven approach
with over SGD$73 million invested since 1995. Significant
public area refurbishment was conducted in the last quarter
of 2005 where the hotel launched the first business centre
- The Executive Centre - encompassing an entire floor on level
22. This included seven meeting spaces offering full-length
window views of the city or harbour.
Says General Manager Mr. Scott Swank, ¡°The renovation is evidence
of our continued commitment to provide guests with the most
updated facilities. Since the launch of the Executive Business
Floors in February 2006, we have experienced overwhelming
demand for this room category as today¡¯s business travellers
become more sophisticated and selective in their accommodation
choices. In light of ever-competitive conditions within the
industry on a local and global level, it is vital for hospitality
players to initiate improvements proactively rather than being
reactive.¡±
CUSTOM-TAILORED TRAVELLER-TECHNOLOGY
Pan Pacific Singapore¡¯s S$14 million renovation from March
to November goes above and beyond aesthetical improvement
to enhance the technological capabilities of guest accommodation.
The features are conceptualized with guests¡¯ needs in mind
based on travel trends that indicate that travellers are increasingly
tech-savvy and increasingly rely on a myriad of technological
equipment while on-the-go.
As part of the refurbishment exercise, Flatscreen LCD Televisions
are now a key feature in rooms (32¡±) and suites (37¡±). In
line with customised guest accommodation experiences, the
hotel ordered a custom-made sophisticated Audio-Visual Portal
(A.V. portal) to be installed in all 778 rooms and suites
to enhance the technological aspect of guests¡¯ stay. The state-of-the-art
multi-connectivity port panel offers integrated audio-visual
output solutions via flatscreen television.
Going the extra mile, the hotel has taken the initiative to
outfit each room with a Cable Wire kit containing six different
cable wires to facilitate the connection of the audio-visual
devices to the A.V. portal. Guests can look forward to connecting
devices such as laptops, digital cameras, video cameras and
even mp3 players for enhanced audio-visual output via the
flatscreen LCD television. This technological feature allows
functions such as music to be played via the surround sound
system, movies and images from electronic devices to be displayed
on the television. For guests¡¯ convenience, the cable wires
are available for purchase from the hotel.
The hotel concurrently upgraded the existing wired and wireless
internet connectivity available throughout the hotel during
the refurbishment to enhance the quality of connectivity for
guests.
38 suites in the hotel have been fitted with Bose Home Entertainment
Systems (3?2?1 GS Series II) with radio, CD and DVD functions.
Guests can enjoy home theatre sound delivered via two adv
anced Gemstone?speakers and the Acoustimass?module.?
The finishing touch is the electronic remote-controlled Roman
drapes and sun filters framing the full-length window views
of the city or harbour. A whimsical and unusual touch; guests
can use a single easy-to-use controller to manipulate the
drapes. The rooms¡¯ lights, air conditioning system, bedside
clock functions can be controlled via an all-in-one bedside
table panel.?
These technological introductions echo the launch of the hotel¡¯s
Executive Centre on level 22 in 2005. The first hotel business
centre to encompass an entire floor, the round-the-clock Business
Concierge avails a complete suite of business and secretarial
facilities and services to travellers while providing a range
of electronic devices and complements available for purchase
or rent.
|
|
|
|
|
|
Arch International Media Limited © MICECHINA.COM,2005-2006.
All rights reserved. ¾©ICP±¸05075426ºÅ
Address:
Room 1502, B Building, Yuanyang Xin Gan Xian, No.66 Xiaguangli, Chaoyang
District, Beijing 100027
Tel:
(8610) 84466451/2/3; Fax: (8610) 84466453; Email:news@micechina.com |
|
|
|
|
|
|
|